For Nov. 2-8, 2014
Bowie County
IH 30 – From Sulphur River to Spur 86, repairing pavement. Various lane closures in both directions.
FM 2253 – From IH 30 to US 82, widening highway.
Camp County
None
Cass County
US 59 – At FM 3129 in Domino, constructing new overpass. Traffic restricted to one lane each direction.
Harrison County
IH 20 – From Gregg County Line to SH 43, repairing pavement. Various lane closures in both directions.
FM 450 – At Little Cypress Creek, replacing bridges and relocating roadway.
Loop 390 – From FM 1997 North to FM 1997 South, milling and repaving highway
Marion County
None
Morris County
US 259 – From US 67 to SH 77, widening shoulders and resurfacing. Roadway closed to through traffic. Detour route is signed.
US 259 – At intersection of SH 49, milling and repaving highway.
Panola County
SH 149 (Carthage Loop) – At FM 10 and also including intersections with South Adams Street and Ball Park Drive, adding turn lanes.
SH 149 – From SH 315 to US 59 South, strengthening base materials and repaving.
Titus County
US 271—From FM 3417 to Camp County Line, repaving highway.
Upshur County
US 80 – At Big Sandy Creek, replacing bridge and approaches.
SH 155 – From south of Sabine River to US 80, replacing bridges and widening roadway.
SH 155 – From US 80 in Big Sandy to Big Sandy Creek, repaving highway.
FM 3245 – From US 259 to SH 154, widening highway.
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Marcus Sandifer, Public Information Officer, TxDOT Atlanta District, 903-799-1306, marcus.sandifer@txdot.gov.