Weekly Roadwork Report – TxDOT Atlanta District
For Jan. 4-10, 2015
Bowie County
US 82 – From IH 30 near New Boston to DeKalb, widening highway. Various lane closures.
Camp County
None
Cass County
US 59 – At FM 3129 in Domino, constructing new overpass. Traffic restricted to one lane each direction.
Harrison County
IH 20 – From Loop 281 to FM 3251, repairing pavement. Various lane closures.
FM 450 – At Little Cypress Creek, replacing bridges and relocating roadway.
Marion County
None
Morris County
US 259 – From US 67 to SH 77, widening shoulders and resurfacing. Roadway closed to through traffic. Detour route is signed.
Panola County
SH 149 (Carthage Loop) – At FM 10 and also including intersections with South Adams Street and Ball Park Drive, adding turn lanes.
SH 149 – From SH 315 to US 59 South, strengthening base materials and repaving.
SH 149 – From US 59 North to SH 315, repairing pavement.
Titus County
None
Upshur County
US 80 – At Big Sandy Creek, replacing bridge and approaches.
SH 155 – From south of Sabine River to US 80, replacing bridges and widening roadway.
FM 3245 – From US 259 to SH 154, widening highway.
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Marcus Sandifer, Public Information Officer, TxDOT Atlanta District, 903-799-1306, marcus.sandifer@txdot.gov.